Jefferson Healthcare South Campus Replacement and Addition
The phased design and construction carefully integrates three (3) existing hospital buildings while demolishing the original 1965 structure to implement
The phased design and construction carefully integrates three (3) existing hospital buildings while demolishing the original 1965 structure to implement
A dramatic heavy timber porte cochère guides guests into toward custom-made reception kiosks, finishes that echo the sea to sky
Townhomes located along the street create a scaled transition toward large podium-style apartment buildings surrounding the central plaza. At the
Demonstrated engineering agility, adapting to an established program. As the building was designed and the massing was approved when we
Contributed design alternatives and cost-effective solutions through multiple phases and construction delivery methods (design-bid-build for Sealth and GC/CM for Denny)
Also known as 35 Stone, this five-story office building is the cultural center of Evo sports campus and home to
Other features include a large learning stair for socialization, learning, and connection between the two floors. A STEM lab and
Helped create a rigorous and methodical rating system to determine which of four potential locations would be best for this
Designed a comprehensive rainwater management system in which rainwater is collected onsite, treated in rain gardens, and stored in a
This half-block high-rise community offers enviable amenities: a fitness center with a yoga studio and personal trainers, private balconies, below