BennettES S150030 01 C150030 02 N20 Play Area Sports Field Students

Bellevue, WA

|

Bennett Elementary School

Project Details

Size

80,000 SF | 9.3 Acres

Client

Bellevue School District

Team

NAC
Edifice Construction Company

Recognition

2020 Learning by Design Education Facilities Design Award: Citation of Excellence Award: Early Childhood School/Elementary School | 2019 A4LE Pacific Northwest Region Pinnacle Award: Project of Distinction | 2018 WASLA Professional Award: General Design, Public Ownership

BennettES S150030 01 C150030 02 N6 Library Students

Other features include a large learning stair for socialization, learning, and connection between the two floors. A STEM lab and Early Learning Center round out learning opportunities for the community. Exposed wood beams in the library complement the warm and natural design palette.

BennettES S150030 01 C150030 02 N5 Learning Stair Students

Participated in the assessment of numerous siting options, providing design alternatives to address the 35-foot-high plateau, high groundwater levels, and soils high in organic material from the former agricultural use and location of Lake Sammamish. More than 215 augercast piles and an intricate maze of grade beams support the structure at its lowest level. Removal of rotted timber piles associated with the former structure and replacement of poor soils with structural fill established a stable foundation.

BennettES S150030 01 C150030 02 N9 Classroom Slope View Students
BennettES S150030 01 C150030 02 N8 Classroom White Board Students

Strategically designed the stormwater system to minimize the detention vault and water quality treatment system and optimize the available site area for school programming, another LID element. The design separates control and treatment of runoff into two areas. The parking lot and other pollution-generating surfaces drain through a swale into a detention vault and water quality facility. The building, playground, and synthetic turf field drain to a gravel detention system located below the field, a solution that reduced the site area needed for stormwater management.

BennettES S150030 01 C150030 02 N19 Exterior View Slope Students

Collaborated with the design team on cost-effective solutions to achieve project goals. The building gracefully transitions up the slope, anchored by concrete retaining walls that also step up the hill. This terraced layout also created opportunities to incorporate exterior views from anywhere in the school.

BennettES S150030 01 C150030 02 Classroom Inside Courtyard Entry Students

Provided easy connections from classrooms to outdoor learning areas, including a large interior courtyard partially supported by the building’s lowest level, and multiple vegetative rooftop learning labs. A lush rain garden graces the building’s east entry, providing additional opportunities to learn about the natural detention and cleansing properties of soil and plants as well as insects and birds that inhabit these areas.

Images © Copyright 2018 Benjamin Benschneider All Rights Reserved.

RELATED PROJECTS

Scroll to Top

The Connection