Projects

Avalon Alderwood Place

Avalon Alderwood Place

Abutting the existing mall, the housing complex features a public plaza between 6-story buildings that functions as a primary entryway.

Arlington Elem School S150092 03 N37 Bldg Profile From Play Area Students

Arlington Elementary School

This was the first school in Tacoma to incorporate the state’s Innovation Schools and Zones program that challenges and re-evaluates

AMZN Arizona S070009 03 02 C070009 02 02 N8 Building Profile Street Corner Pedestrians Living Wall Entrance Activated

Amazon Arizona Building

Despite tight floor-to-floor heights, the team maximized available interior space through precise integration of mechanical, electrical, and plumbing systems with

5501 Lakeview S172371 01 C172371 02 N71 Interior CLT Mass Timber

5501 Lakeview

The project includes two levels of office space and two levels of underground parking, matching the civic scale of the

2005 Poplar S180722 01 N16 Exterior Night Entrance Stair

2005 Poplar

Dramatic cantilevers with 9-foot CLT overhangs crown the extraordinary structure, and exposed steel framing and braced frames celebrate the interior

1916 Boren Exterior

1916 Boren

The concrete-framed building replaces an inactive car rental business and surface parking lot, thoughtfully addressing the community’s feedback for a

Scroll to Top

The Connection