Ondina
With 20% of the 249-units dedicated to affordable housing, adjacent proximity to the BelRed light rail station, and LEED Gold
With 20% of the 249-units dedicated to affordable housing, adjacent proximity to the BelRed light rail station, and LEED Gold
A light-filled, inviting entry welcomes both students and visitors to this 750-seat concert hall which is available for district-wide and
The wood framed school buildings resemble longhouses and feature exposed heavy timber and glulam beams in the roof structure. The
Partnered with Microsoft and pushed creative boundaries to create a one-of-a-kind workspace. Open, collaborative and modern, the buildings are completely unique
Completed a structural renovation and a seismic upgrade. The seismic upgrade added new concrete shear walls, infilled an existing elevator
An important piece of the school’s sustainability vision was salvaging as much as possible. This included giving new life to
The station’s enhanced design sets precedent for improved safety and wellness standards being adopted nationally. Programming includes three drive-through bays,
Expansion of the landmark 1917 Kelly Springfield Building preserved the façade and some interior elements while incorporating materials and architectural
Serving as mass timber educators and advocates, our engineers helped the team and district conceptualize, adapt, and ultimately bring mass
With facilities stretched to capacity, Jefferson Elementary in Mount Vernon, Greywolf Elementary in Sequim, and Maple Elementary in Seattle embarked