Project Image Wsu

Pullman, WA

|

WSU PACCAR Environmental Technology Building

Project Details

Size

96,000 SF | 2 Acres

Client

Washington State University

Team

LMN Architects
Skanska USA Building

Recognition

2018 AIA Washington Council Civic Design Award, Honorable Mention

WSU PACCAR Conference Room CLT S120091 04 C120091 05 N136
WSU PACCAR Main Street CLT S120091 04 C120091 05 N131 1

Incorporated CLT panels and mass timber throughout prominent public areas – engineered lumber materials that WSU has helped develop for decades.

WSU PACCAR Workhorse Bar Main Street S120091 04 C120091 05 N134 Medium

Committed to understanding the details and unique technological requirements of the space, then responded with custom solutions for various program areas.

Equipped the space with two wings, one with lab and office spaces and the other with an impressive showcase bar and high-bay area. Intended for structural experiments, the high-bay area features a reaction floor and wall as well as a bridge crane.

WSU PACCAR Workhorse Bar High Bay Heavy Materials Lab S120091 04 C120091 05 N77
WSU PACCAR Workhorse Bar Lab Fume Hoods S120091 04 C120091 05 N108

Facilitated learning via future alternative pavement areas, the five-by-five squares allow students to easily remove and replace units, thereby experimenting with different pavement types. Additionally, the porous pavement and rain wall serve as regular “field trip” locations, allowing students to see environmental technology in action.

Focused on sustainability and collaborated with university professors and end-users to create drainage concepts, design a rain garden and develop strategies for stormwater treatment.

Adapted to challenges posed by the site by coordinating site demolition, mass earthwork, grading, and the construction of a new utility tunnel to the Grimes Way network.

RELATED PROJECTS

Scroll to Top

The Connection