UW Husky Union Building Modernization

Project Details

Size

260,000 SF | 0.33 Acres

Client

University of Washington

Team

Perkins&Will
Skanska USA Building

Recognition

LEED Gold certification | 2014 ACUI Facility Design Award of Excellence | 2013 AIA Civic Design Award

UWHUB S091620 02 C091620 01 N11 Exterior Floating Entry Ramp

Created a value engineering solution to rebuild the auditorium wing from the ground floor level with a light-framed custom steel-and-timber structure, saving about $1 million and eliminating all bracing that was obstructing views.

UWHUB S091620 02 C091620 01 N16 Glass Entry Dusk
UWHUB S091620 02 C091620 01 N113 Atrium Staircase Cross Section
UWHUB S091620 02 C091620 01 N80 Auditorium People

3-D structural modeling enabled team members to streamline coordination of complex systems related to the interface of structural, mechanical, and electrical elements within the 11- to 12-foot floor-to-floor heights, and limit change orders.

Collaborated with specialty curtain wall and timber fabricators to create dramatic main entry vestibules and unique lyceum structure.

UWHUB S091620 02 C091620 01 N41 Exterior Floating Entry Ramp Closer

Reworked the area surrounding the HUB to improve pedestrian and ADA access. An elegant, floating ADA walkway was constructed over the rain garden at the south entry. Loading yard modifications allow trucks to maneuver entirely within the loading area, significantly improving public safety by eliminating the need to back through pedestrian pathways.