Allen Institute S121620 02 C121620 01 N485 Street View Alt

The Allen Institute

Project Details

Size

271,000 SF | 1.2 Acres

Client

Vulcan Real Estate

Team

Perkins&Will
GLY Construction

Recognition

2017 R&D Magazine High Honors Award: Laboratory of the Year | 2016 NAIOP Night of the Stars Technology/Life Sciences Development of the Year | 2016 AGC Build Washington Awards Private buildings $50-$100 million | 2016 AIA Honor Awards Honorable Mention | 2016 ACEC Engineering Excellence National Silver Award - Structural Systems | 2016 Masonry Institute of Washington Excellence in Masonry: Modernization and Restoration Honor Award + Design Integrity Award | 2016 ENR Best of the Best Higher Education/Research Project | 2015 ENR Northwest Best Office/Retail/Mixed-Use Project

Utilized an integrated design process to design something unlike anything the team had achieved before in a short amount of time.

Leveraged experience in the South Lake Union area to coordinate construction, secure permits and work with neighboring sites, ultimately identifying significant cost-savings and expediting and streamlining the project.

S121620 02 C121620 01 N493 medium
S121620 02 C121620 01 N512 medium

Customized structural designs to the unique needs of each floor, understanding the requirements of the future scientist tenants, considering details like floor frequency, and ensuring the space was equipped to support delicate experiments and trials.

Aligned designs with the architectural vision of an open, collaborative workspace by transitioning from the underground garage to the first level with a complex transfer column design, ultimately allowing for research and work spaces to be arranged in a series of “petals” around a six-story, light-filled central atrium.

S121620 02 C121620 01 N487 medium

Preserved historic elements of the Ford and Pacific McKay buildings including the elaborate, original terra cotta façades. Our team collaborated with the historic renovation team to carefully reconstruct the west side of the building.

Collaborated internally as both the structural and civil practices responded to unprecedented engineering challenges presented by extraordinarily poor soil, a below-grade loading dock, and a build that extended 20 feet below the groundwater table.

Photography © Lara Swimmer and Nick Merrick; ALL RIGHTS RESERVED