Microsoft West Campus Studios, Commons & Parking Garage

Project Details

Size

1,050,000 SF | 47 Acres

Client

Microsoft Corporation

Team

Callison
GLY Construction
Mortenson Construction

Recognition

Building 97: LEED Silver | Commons: LEED Gold, NAIOP Office Development of the Year 2008 | Buildings 37, 99: 2008 NAIOP Sustainable Development of the Year

Microsoft Bldg 98 C060009 02 01 N164 Plaza People Activated Daylight

Each building is of similar construction: a four-story concrete structure consisting of four L-shaped wings joined by a central atrium and connecting floors, with a partial basement located under one of the wings.

These buildings have large elevated slab floor plates, and their use of access flooring for air distribution is one of the most extensive applications anywhere.

Microsoft Studios West Parking C060009 02 01 N156 Subterranean Garage Entrance Cars

The five-story below-grade garage required the excavation of almost 1 million cubic yards of dirt, and with a capacity of 5,000 stalls, is among the largest parking structures in the nation.

A minimum soil depth of 3 feet above the garage lid promotes natural infiltration of stormwater through the soilsbefore entering the drainage system. This infiltration process reduces stormwater flow rates considerably when compared to runoff from a conventional garage.

Microsoft West Campus C060009 02 01 N162 Signage Buildings Exterior Sports Field
Microsoft Bldg 98 C060009 02 01 N72 Building Profile Exterior Seating Sunset

To accommodate the project’s fast-track construction schedule, a phased approach to site design was used for the removal of several buildings, relocation of a city street, and design of site infrastructure in accordance with stringent city regulations.

Microsoft Bldg 98 C060009 02 01 N63 Sports Field People Buildings Plaza Activated

Photography © Andrew Buchanan/SLP