Seattle, WA

|

Hazel Wolf K-8 STEM School

Project Details

Size

78,000 SF | 3.2 Acres

Client

Seattle Public Schools

Team

NAC Architecture
Lydig Construction

Recognition

2018 A4LE Pinnacle Award: Project of Distinction | 2017 A4LE LESolutions Planning and Design Award: James D. MacConnell Finalist | 2015 World Architecture News: Future Projects Education

HazelWolf S130030 07 C130030 05 N23 Calc Wall Horizontal

Fostered hands-on learning experiences supporting the environmental, science, technology, engineering and mathematics (E-STEM) curriculum. In one instance, structural calculations used for design of the exposed steel braced frame are imposed on a three-story wall. Exposed concrete slabs reveal the structure’s skeleton and enable students to visualize how their school was built.

HazelWolf S130030 07 C130030 05 N39 Nature Cycle Courtyard Rain Garden
HazelWolf S130030 07 C130030 05 N34 Exterior Lrng Circle

Integrated multiple collaborative learning and play zones, including a large rain garden and an elevated green roof learning area, in the Nature Cycle Courtyard. A water feature (stream) collects building runoff, which flows into the rain garden at the base of the sloped play area. This rain garden provides an opportunity for students to learn about evapotranspiration: as the soil filters the runoff, groundwater is recharged, water changes to vapor on plant and soil surfaces (evaporation), and water is returned to the atmosphere through plant leaves (transpiration).

Facilitated highly detailed coordination with the architect so that elements of this outdoor learning space fully embraced the interactive learning experience and maintained a tight budget.

HazelWolf S130030 07 C130030 05 N35 Bldg Profile
HazelWolf S130030 07 C130030 05 N20 Green Wall

Expedited an early bid package for demolition and site prep, including major utilities and a large detention vault, through proactive coordination with the architect and owner, so that phased construction started on time.

Maximized the project’s footprint by integrating temporary shoring, retaining walls, and vegetated slopes, and locating the geothermal well system below the buildings.