Do you know anyone who jumps for joy at the thought of building codes? Let’s be real, they can be confusing, complicated, and overwhelming. However, we can all agree how important they are in maintaining safe built environments. They also inform everything we do as civil and structural engineers. With Seattle’s need for more housing, coupled with a desire to address severe office vacancies, office-to-residential conversions are top of mind. Nevertheless, there are challenges, including how to best navigate the Seattle Existing Building Code (SEBC). Engineers at Coughlin Porter Lundeen have developed a deep understanding of the code requirements needed for these conversions and are prepared to help.
Navigating Substantial Alterations for Office-to-Residential Conversions
Understanding the Requirements
The City of Seattle has a unique Substantial Alteration code provision that is triggered by an existing building’s change of use to a more hazardous occupancy, such as from commercial to residential. When a project is determined to be a substantial alteration, the entire building needs to be upgraded to specific code requirements regarding:
- Fire
- Life safety
- Accessibility
- Energy conservation
- Structure and seismic
Although these requirements can seem intimidating, fear not! Remember: These office-to-residential conversions are being upheld by the SEBC and not to new building standards. This means the code provisions aren’t as strict, and the Seattle Department of Construction and Inspections (SDCI) can provide some wiggle room. SDCI encourages people to set up pre-submittal meetings to discuss how these code requirements can be addressed, as well as any impracticalities to following these stipulations.
Our Blueprint for Success
Our combined experience with multi-unit residential buildings and historic renovation projects sets us up for success with office-to-residential conversions. We’ve designed over 78 million square feet of multi-unit residential buildings—from high-rise to podium and garden-style housing. We’ve also designed over 11 million square feet of historic renovation projects. Our deep knowledge of both markets allows us to seamlessly blend the old with the new, breathing new life into repurposed structures.
Our experience reveals that many concrete buildings from the 1920s are configured well for residential adaptive reuse due to their letter-shaped floor plans. E-, F-, and L-shaped buildings contain multiple wings that can be efficiently configured as double-loaded corridors, allowing daylight to flood apartment units on both sides of the hallway. In contrast, most rectangular office buildings have floor plates that are too deep for residential use, so it becomes harder for natural light to reach the depths of apartments. Many of the letter-shaped buildings from the 1920s were also designed for future vertical expansion which can make adding a rooftop amenity deck straightforward from a structural standpoint.
The right team for transforming a commercial building for residential use understands how to take advantage of such challenges and turn them into opportunities. We have an extensive archive of historic building scans from several city- and portfolio-wide building studies — well over 1,000 buildings in our archives at our fingertips. This makes it easy for us to quickly assess any building that is being considered for conversion.
Coughlin Porter Lundeen has completed over 60 substantial alteration projects and has participated in over 100 pre-submittal meetings with the City of Seattle. We understand the city’s point of view and come prepared for the pre-submittal meeting with a strategy to negotiate practical solutions. Because each project and building is unique, we approach them with a fresh set of eyes, working with the owner, design team, and contractor to craft a compelling story that addresses the city’s key concerns balanced with the practicalities of executing these difficult projects. The city is increasingly willing to provide flexibility due to the larger public policy goals that these projects address.
Once the project’s goals are negotiated and set with the city, we work hard to minimize seismic upgrades and cost. We maximize the inherent capacity of the existing building. We tailor surgical solutions to address only what is deficient, often avoiding costly new seismic interventions such as concrete shear walls or steel braced frames.
As office-to-residential conversions become more commonly considered in Seattle, we’re happy to walk a building with anyone interested in taking on these adaptive reuse projects and share our insights based on experience.
Interested in learning more? Check out our selection of renovation, adaptive reuse, and substantial alteration projects below. And feel free to contact me directly with any questions.
Project Highlights
Palladian Hotel
State Hotel
The Astor at the Washington Building
Queen Anne Exchange
201 Queen Anne Ave Conversion
Alaska Building Renovation and Addition
Arctic Club Hotel Renovation
Seaboard Building Renovation